COMMON DUE‐WINDOW SCHEDULING

FRANZ‐JOSEF ‐J KRÄMER*, CHUNG‐YEE ‐Y LEE

*Corresponding author for this work

Research output: Contribution to journalJournal Articlepeer-review

50 Citations (Scopus)

Abstract

In this paper, we solve common due‐window scheduling problems within the just‐in‐time window concept, i.e., scheduling problems including both earliness and tardiness penalties. We assume that jobs share the same due window and incur no penalty as long as they are completed within the due window. We further assume that the earliness and tardiness penalty factors are constant and that the size of the window is a given parameter. For cases where the location of the due window is a decision variable, we provide a polynomial algorithm with complexity O(n * log (n)) to solve the problem. For cases where the location of the due window is a given parameter, we use dynamic programming with pseudopolynomial complexity to solve the problem.

Original languageEnglish
Pages (from-to)262-275
Number of pages14
JournalProduction and Operations Management
Volume2
Issue number4
DOIs
Publication statusPublished - Dec 1993
Externally publishedYes

Keywords

  • DUE‐DATE WINDOW
  • DYNAMIC
  • PRODUCTION SCHEDULING
  • PROGRAMMING

Fingerprint

Dive into the research topics of 'COMMON DUE‐WINDOW SCHEDULING'. Together they form a unique fingerprint.

Cite this