Abstract
This paper studies a single-item production planning problem for a manufacturing firm. Besides being able to acquire raw material from an external supplier, the firm may also face an incoming stream of internally supplied raw material. In addition, outsourcing may serve as an alternative to in-house production for the firm to satisfy its demands. Attention is focused on the case where acquisition, production, and outsourcing costs are setup-linear and inventory holding costs are linear. For this case, polynomial algorithms are presented for some situations and the NP-hardness of other problem is shown. A computational study is used to show the competitiveness of the proposed heuristic. [Supplementary materials are available for this article. Go to the publisher's online edition of IIE Transactions for the following free supplemental resource: Appendix]
| Original language | English |
|---|---|
| Pages (from-to) | 188-202 |
| Number of pages | 15 |
| Journal | IIE Transactions (Institute of Industrial Engineers) |
| Volume | 42 |
| Issue number | 3 |
| DOIs | |
| Publication status | Published - Mar 2010 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 9 Industry, Innovation, and Infrastructure
Keywords
- Dynamic programming
- Lot sizing
- Outsourcing
- Production planning
Fingerprint
Dive into the research topics of 'Managing partially controllable raw material acquisition and outsourcing in production planning'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver