Abstract
This paper considers a single machine scheduling problem with preventive maintenance. In many cases, a machine must be maintained after it continuously works for a period of time. But most papers in the literature ignore non-availability of the machine. For this reason, this paper studies the problem of scheduling processing of jobs and maintenance of machine simultaneously. The objective is to minimise total completion time of jobs. The problem is provedto be NP-hard in the strong sense. Three heuristic algorithms and a branch and bound algorithm are proposed. Computational experiments are done to evaluate the effectiveness of the algorithms.
| Original language | English |
|---|---|
| Pages (from-to) | 1071-1078 |
| Number of pages | 8 |
| Journal | Journal of the Operational Research Society |
| Volume | 50 |
| Issue number | 10 |
| DOIs | |
| Publication status | Published - Oct 1999 |
| Externally published | Yes |
Keywords
- Branch and bound
- Heuristics
- Maintenance
- Scheduling