Single machine flow-time scheduling with scheduled maintenance

Chung Yee Lee*, Surya Danusaputro Liman

*Corresponding author for this work

Research output: Contribution to journalJournal Articlepeer-review

179 Citations (Scopus)

Abstract

In this paper, we investigate a single machine scheduling problem of minimizing the sum of job flow times subject to scheduled maintenance. We first provide an NP-completeness proof for the problem. This proof is much shorter than the one given in Adiri et al. [1]. The shortest processing time (SPT) sequence is then shown to have a worst case error bound of 2/7. Furthermore, an example is provided to show that the bound is tight. This example also serves as a counter-example to the 1/4 error bound provided in Adiri et al. [1].

Original languageEnglish
Pages (from-to)375-382
Number of pages8
JournalActa Informatica
Volume29
Issue number4
DOIs
Publication statusPublished - Apr 1992
Externally publishedYes

Fingerprint

Dive into the research topics of 'Single machine flow-time scheduling with scheduled maintenance'. Together they form a unique fingerprint.

Cite this